Downloads Strukton Rail 


Corporate video
Strukton Rail corporate film
Strukton Rolling Stock film

Annual Report 2010
Strukton annual report 2010

Annual Reports 2009
Strukton annual report 2010
Strukton annual review 2010
Strukton annual report 2009
Strukton annual review 2009

Strukton Rail
Corporate brochure (English)

Sustainability
Sustainable innovative power
Sustainability statement

Data Capturing
POSS
POSS brochure
Monitoring & Travel Systems
Commissioning, Service & Maintenance
Monitoring & Travel Systems Optimises train detection with POSSonline
MicroPOSS 2
POSS Monitoring of point heating
POSS Wheel Condition Monitoring
POSS Point machine monitoring
POSS Points Monitoring 2.0
POSSonline Release 6.0
POSS Docklands Lightrail
POSS Victoria Station
POSS West Coast Main Line
Visual monitoring of level crossings
POSS® Dutch Railways
POSS Rolling Stock

PID (Passanger Information Display)
DRIS, knowing when you will leave
PID Metro Rotterdam
PID Zoetermeer
PID Fast ferry Rotterdam
PID TramPlus Rotterdam
PID Hoogkerk
PID Zeeland
RandstadRail Vehicle tracking system

Other
Permanent camera inspection
Track-N-Trace
System and Software engineering
Geocon South Korea

Maintenance management
Targeted measurement and analysis
Maintenance concepts

Infrastructure
Signalling and power supplies
ERTMS
Traction and overhead wiring
Building of Betuwe Route
Hanzelijn Superstructure

Rolling Stock
Strukton Rolling Stock
VIRM Train air-conditioning units
Arnhem Station area
Hanzelijn Control panel cabinets
ICM trains 1 to 4 Cabling
Electrical systems Locs India
ACEMU Electrical systems India
Transformation of DD-AR trains into DDZ-trains
POSS on Rolling Stock
Traction Systems Toulouse metro
New construction of VIRM trains
Sprinter Light Train (SLT) Cabling
Dispatch whistle Relay panels for ICM door system
Green and Wireless

Machines & Logistics
Machines & Logistics
Gemma

Energy Solutions
12.6 kV Power station Aruba
Electrification of Hall 25 in Haarlem
Power Supply EVP Suriname

PPP
The power of PPP in light rail

Terms and Coditions for purchasing and outsourcing
General Terms and Conditions

Version 6.5 or higher of Acrobat Reader is required to read the dynamic version of the annual report. You can install the newest versions of Acrobat through the Adobe website.