Strukton Rail has replaced the 10 kV medium-voltage installation for the Aruba power station with a 12.6 kV installation.
Work
The installation was erected and handed over by us on a turnkey basis. In addition, Strukton Rail designed and supplied a control and protection system, whilst we also undertook the disassembly and assembly work for the existing switching station.
Conditions
The work had to be carried out whilst the power station remained fully in operation. If the power station had been shut down, the entire island would have quickly been completely without water and electricity.
Project components:
Engineering, supply and erection of medium-voltage installation
Engineering, supply and erection of control, SCADA and protection systems for this installation
Design of a conversion plan whilst guaranteeing water and electricity supply
Removal of the old installation
Civil engineering activities
Testing and commissioning
Training the staff of the WEBÂ
Drawing up documentation