In the framework of the project at Swalmen for the A73 Motorway Track Relocation, a new stop was built. For this stop, Strukton Rail supplied and installed telecommunication installations.
Activities
- Establishing intercommunication possibilities (including network cabling) for various systems
- The supply, installation and adjustment of the PA installation
- Placing and installing loudspeaker columns
- Altering the software at the Maastricht main control post
- Placing and installing clocks
- Placing the LSA+ distributor and coil rack on the wall
- Placing and installing overvoltages in the relay room
- Providing telephone and connections in all technical rooms
- Relocating the existing ZMX subpost to the new telecom room