News 

 

Strukton Rail wins contract for Oslo metro line 

 

Activities 

 

Vacancies 

 
 
On 12 June, KTP AS and Strukton Rail signed the contract for the construction of a new third rail and renewal of the existing metro line in Oslo. The Nordic World Ski Championships 2011 will take place at the Holmenkollen Ski Jump in Oslo. Public transport operator SKA wants to provide for a good connection between the city of Oslo and the ski jump. The construction of the new third rail and rehabilitation of the tracks is to facilitate for the new MX 3000 trains that will run when the Ski Championships start in 2011.

The contract sum for this ‘Holmenkollbanen’ contract is approximately 11 million euro, a bit over 3 million of which is to be spent during 2009. The project will start on 17 June. the line will be closed for traffic during the summer.
 
As a full-service provider, Strukton Rail combines the following core activities:

 

Infrastructure 

Design, maintenance, renewal and constructuction of all railway elements.
 

Rolling stock 

Smart train technology for the complete lifecycle. Tailor-made solutions for new and existing trains.
 

Maintenance management 

A basis for trust and peace of mind created by providing insight into the work. The philosophy: perfect operations through prevention.
 

Machines & logistics 

Management, rental, transport and maintenance of one of Europe's largest and most advanced fleet of machines.