150kV Substation Graetheide

Strukton Systems replaced two 150kV circuit breakers for the Dutch grid operator TenneT. The circuit breakers were replaced during two power outages in two weekends. The preparatory works consisting of civil works, steel works and secondary connections were performed in the weekend before the replacement of the circuit breakers. Testing and commissioning of the circuit breakers was performed in close cooperation with TenneT personnel.

Client:
TenneT NV
Location:
Substation Graetheide, Sittard
Activity:
Energy systems
Country:
The Netherlands
Graetheide1
Graetheide2
Graetheide3
Graetheide4

Tab 1

Project summary

  • Replacement of two existing 150kV circuit breakers
  • Testing and commissioning